Project Description

Residents of Wiardunki and the surrounding areas can finally enjoy the new bridge over the Flinta River, connecting Ryczywół and Rogoźno. After a long wait, the investment was officially completed on Tuesday, June 29, 2021, with the participation of local authorities, designers, and the contractor.

The bridge was in very poor technical condition, posing a danger to drivers and pedestrians. Frequent repairs, which were no longer effective, further complicated traffic for both residents and transport companies.

The previous bridge was built in the 1950s and was in very poor technical condition. It did not meet the required strength and operational parameters. Additionally, its load capacity of up to 20 tons made communication difficult for residents and local transport companies.

Zofia Kotecka

Municipal Governor

The investment cost amounted to PLN 1,739,812.05, carried out by our company. Upon completion, the bridge meets Class B load capacity standards, allowing vehicles weighing up to 40 tons. The project also includes a two-lane road with a width of 2x3 meters and a 2-meter-wide pedestrian sidewalk on both sides. The entire reconstruction covered a 12.28-meter-long bridge section.

We are glad to have completed this project because it was very important for the residents of our municipality.

Henryk Szrama

Mayor of Ryczywół

The Oborniki County received PLN 934,608 funding from the Ministry of Finance, while the Ryczywół Municipality contributed PLN 510,000 to the project. Authorities emphasized that the quick reconstruction of the bridge was possible thanks to the cooperation of all involved parties. Now residents can once again use a safe and modern bridge that will serve them for many years.

Building a bridge is neither easy nor cheap, but this investment is a model example of cooperation between the municipal and county governments.

Zofia Kotecka

Municipal Governor

Project Details

  • Category Road Bridge
  • Client Ryczywół Municipality
  • Project Date Q2 2021